Comments on the Scope of the Supplemental Environmental Impact Study

Dear Blue Line Extension Leaders and Environmental Compliance Lead Ms Neha Damle:

The Blue Line Coalition includes 13 organizations with roots in communities that live, work, go to school across the corridor of the Blue Line extension project. Our advocacy aims to ensure the opportunity that comes with building a train through our communities does not harm us, but materializes the benefits and impacts that we envision collectively as a community.

This letter is to provide comments on the publication of the scope for the supplemental environmental impact study (SEIS) on the blue line extension project. The SEIS is an opportunity to ensure that our collective efforts between the project team, elected officials, and community to address anti-displacement before, during and after construction become a reality.

To that end, the scope of the study must be expanded to include the following:

  • Understands the social and community impact that the development of the train will have across the corridor before, during and after construction — specifically looking at the impacts of the global pandemic of COVID-19 and the civil unrest that impacted the corridor in 2020.
  • Covers the mitigation of previous harms made by the route modification — such as impacts to the Harrison Neighborhood, the Heritage Park Neighborhoods — by the design of the blue line extension project.
  • Studies the business, housing and cultural displacement as a result of the construction, design of the blue line extension project; and mitigation strategies that can be applied  before, during and after construction such as technical assistance and forgivable grants
  • Includes mitigation strategies that invest in neighborhoods that have been historically underinvested and disproportionately impacted by racist planning processes and policies; not deconcentrating areas of poverty.

Thank you for your time,

Ricardo Perez
Blue Line Coalition/The Alliance

Denise Butler
African Career, Education & Resources Inc. (ACER)

Ivory Taylor
Housing Justice Center

Anida Phomsendy 
Lao Center of Minnesota 

Christi Sullivan
Heritage Park Neighborhood Association

Karla Arredondo-Payan
Pueblos De Lucha Y Esperanza

AsaleSol Young
Urban Homeworks

Kenzie O’Keefe
Pillsbury United Communities

Sue Watlov Phillips
Metropolitan Interfaith Council on Affordable Housing

BLC votes NO on route modification

The BLC is part of the Corridor Management Committee (CMC) — a voting body that advises the Metropolitan Council and Hennepin County on the design and construction the Blue Line extension project. Most projects like this have a CMC — but this one is different. Thanks to years of advocacy, BLC partners (with the support of then Rep. Keith Ellison) secured two seats at this table, which is otherwise composed of mayors and senior planners from the corridor cities. Our inclusion intentionally makes room for underrepresented communities who are disproportionately impacted by the construction of the Blue Line extension project.

On June 9, 2022, the CMC voted on the recommended modified route. BLC took a strong stance and voted NO. This is not because we are against transit development. It is because we are a coalition of organizations that deeply care about and love our communities and demand that patterns of harm are broken and history is made — with us and for us.

This is what we shared with the committee when we voted NO:

We, the Blue Line Coalition, are disappointed at the lack of intentionality to align the timing of the route modification to the efforts to ensure that Black, immigrant, and people of color communities benefit directly from the construction of this transit project — rather than paying the ultimate price: being displaced.

It is disappointing that all we have learned and seen at the city, county and regional level over the past several years was not enough to compel action on anti-displacement before choosing a new route for the Blue Line extension project. 

Our collective memory has not changed. We remember Rondo. We remember Olson Memorial Highway. We remember all of those community members and families who have been disproportionately negatively impacted by transportation projects funded by our tax dollars.

We continue to look for ways to support this project. We welcome investment and the ability to create pathways for our micro and small businesses to move from renters to owners. We welcome safe, reliable transportation for our community members, who are transit dependent and currently unable to take their kids out on the weekend to visit the cities where we live and work. We strongly believe that our community deserves nice things, like a grocery store where we can buy healthy foods to cook meals for our families.

But, because of the enormous respect and love that our communities deserve, we must stay true to our principles. We cannot support a project that is being built in the name of equity, when we still do not know how much money will be allocated to address the inequities that have shaped our neighborhoods for generations. So we are voting No.

We do remain hopeful that change is possible. Through our collective efforts we were able to produce many comments during the commenting period for the route modification report that agreed we can do better on the Blue Line extension project. We appreciate and support the efforts of Minneapolis City Councilmember Jeremiah Ellison, Hennepin County Commissioners Irene Fernando and Jeff Lunde, Representative Ilhan Omar, and Senator Tina Smith. However, every day that passes without cohesive and concrete efforts by all levels of government, we miss the opportunity to build a different kind of legacy — a legacy that can catalyze our communities’ economic success.

We will continue to eagerly and assertively find ways to support this project once we see in place the demands that we are putting forward and once the timeline is build to break historic patterns of harm.

Read more in our comment letter and community report!

Sign-on Letter: Response to Route Modification Proposal, May 2022

The Blue Line Coalition is rooted in the BIPOC and immigrant communities that will be most impacted by the Blue Line Extension project. Since 2013, we have been working together to make sure government leaders recognize the Blue Line extension is a racial justice and regional equity issue and that community inclusion and leadership must be central to ALL planning and outcomes.

After nearly a decade of planning, and more than $100 million spent, the Met Council and Hennepin County announced in August 2020 that they were abandoning the previous route for the Blue Line Light Rail Extension project. In April 2022, the project team released its route recommendation and once again we are deeply disappointed to see a missed opportunity to break away from long-standing patterns of public planning that fail to prioritize or take concrete action to shift the predictable and disproportionate harms that impact our communities. 

We believe in this project because our communities have a right to quality transit projects and safety improvements. We see a vibrant future where fast, reliable transit options make it possible for a mother to attend her daughter’s soccer game instead of waiting on multiple bus transfers. We see train stops that serve and grow immigrant and BIPOC business districts that create wealth and stability in our cultural communities. We see safe street crossings that allow elders to walk to their community-owned grocery store. 

But that requires a different planning approach — one that doesn’t aspire to equitable outcomes but takes the intentional steps at the appropriate time to achieve a different result. 

Because of our decades of deep relational organizing and years of engagement on this project, the Blue Line Coalition has the expertise and solutions to advance equitable outcomes. Together, BLC partners have successfully advocated for community-centered approaches, including advocating for adequate funding to resource community organizations in building trusting relationships with people who have vital expertise but have been blocked from participation due to cultural, language, financial or other barriers; extending the timeline for the selection of a new route to create space for authentic community engagement; and centering the adoption of anti-displacement policies as an essential aspect of the planning process. 

That is why we are frustrated to see, in report after report, at every step of this very long process that we have been committed to for nearly a decade, the concerns of our communities — especially around anti-displacement issues — are bookmarked for later discussion, later action. We know that this approach ends up being too late for our families, our businesses and our lives. That’s why we have been putting forward concrete policy recommendations for years, including residential and commercial rent stabilization, tenant opportunity to purchase and more effective inclusionary zoning measures. Yet, once again, those recommendations are erased and our communities are asked to sit at another Anti-Displacement Work Group to reiterate to policymakers and project leaders what we already know and have made abundantly clear. 

The “Route Modification Report” only further underscores that displacement and gentrification are a broadly held and overwhelming concern of the communities most likely to be negatively impacted by development pressures and construction impacts from the project. And yet, this central and persistent concern is sidelined as a separate issue, warranting just a few paragraphs in the “Process Overview” in a 124-page report. While the report is replete with timelines for all aspects of the project there is NO time table for the adoption of these crucial protections for our communities. We have made clear that anti-displacement measures must be the foundation, the backbone, upon which this project is built, and yet again we see the same patterns at play that push our communities out of their homes and businesses. 

Let us be clear, this will be NOT BE a “community-supported route” unless:

  • Clearly communicated concerns around gentrification are addressed first — not left to 2023 or beyond following the conclusion of a county work group
  • Strong anti-displacement policies are in place — not simply proposed for future adoption without any assurance that those protections will materialize 
  • Significant financial resources are secured to ensure increased ownership and stability for marginalized businesses and residents — not an unmet aspiration left to the political will of future leaders  

There is an urgent need to redress the disinvestment and lack of transit options our neighborhoods have endured for generations. Once again, we reiterate that the project must address the following: 

  • MITIGATE harm: In all phases of this project — from pre-development to post-construction — historically and systemically marginalized communities will be disproportionately negatively impacted by the Blue Line extension. Even with the best of intentions, we know that much of the new development will not be accessible to our residents, corporate speculation will buy out or undermine many of our businesses, rising property values will push out lower-income families and massive disruption to neighborhoods and businesses during construction will cause emotional stress and economic strain. It is not an unintended consequence when we can clearly predict the outcome. That is why the project must outline a mitigation fund for each phase of the project that is commensurate with the size and scope of the project — and the demographic of residents and business owners along the corridor.  For the Green Line LRT project, for instance, nearly $16 million in public funding was invested before and during the project construction to mitigate disruption to businesses along the route. We know that, even with the addition of nearly $12 million in philanthropic support through the Central Corridor Funders Collaborative this was nowhere near enough to support business, housing and other development that maintained or increased the prosperity of historically and systemically marginalized communities. Therefore, given the dramatically larger scope and geography of the Blue Line Extension Project, Hennepin County and Met Council leaders must commit to a minimum of $150 million in public funds — and a commitment to raise $150 million more through private and philanthropic sources — to protect our communities from displacement and economic harm. 
  • ARTICULATE benefits: Yes, our communities deserve fast, affordable and reliable transportation options. But we also deserve to benefit from the billions in investment that will come along with this publicly funded infrastructure project. Much like a stadium or mega-development, the Blue Line extension will create new opportunities along the corridor and have massive ripple effects in the adjacent neighborhoods. Immigrants and communities of color who live and work along the corridor must have clear and binding commitments from each government entity engaged in the Blue Line as well as each contractor that is hired to do work on the Blue Line that articulate expected outcomes with detailed timelines — and accountability measures if those outcomes are not met. This must directly involve and center systemically and historically marginalized people in the community and could take the form of a Community Benefits Agreement or other model. 
  • LEGISLATE protections: We remain hopeful that the Anti-Displacement Work Group will produce strong recommendations — but we simply cannot wait for the conclusion of yet another process of studying a problem for which our communities have already proposed solutions. Prior to route recommendation approval by Hennepin County and the Met Council, we need corridor cities to commit to the passage of essential anti-displacement measures — including those outlined in the Blue Line Coalition 2022 Community Report and articulated in the demands from Harrison Neighborhood Association — before breaking ground on the project, because we know that once the first shovel hits the ground, it’s already too late.
  • COMMUNICATE effectively: There are still members of our community who live within a few blocks from — or directly on — the proposed route who have heard nothing about this project. We recognize that the county and Met Council have limited resources, but it is absolutely imperative and incumbent on project leaders to understand and implement communications strategies that effectively connect with the communities most impacted along the corridor. Hennepin County and Met Council leaders must commit to a minimum of $5 million in public funding to community-based and culturally connected organizations to disseminate relevant and comprehensible information through video, public arts, door knocking and other outreach activities. 

We want to believe in and support this project. But it MUST break harmful patterns by putting forward a route that addresses our communities’ needs first, not last. 

There is no doubt that many light rail lines in our region — and across the country — have pushed out current residents, immigrants and communities of color from their homes and businesses. We know Hennepin County and Met Council leaders are claiming this will be a “community-supported” route and project. We do not agree. Our communities have the solutions and we urge you to not just hear and study our concerns but work with us to create lasting change.

Signed by,

The Alliance
Harrison Neighborhood Association
Our Streets Minneapolis
Pueblos de Lucha y Esperanza
Pillsbury United Communities
Heritage Park Neighborhood Association
MICAH
Urban Homeworks
MN350
HOME Line

If your organization would like to sign on, please email ricardo@thealliancetc.org

Tell Project Leaders: Stop the Cycle of Transit Displacement!

Click here to send your comment!

Since 2013, the Blue Line Coalition has been working together to make sure government leaders recognize the Blue Line extension project is a racial justice and regional equity issue and that the most directly impacted and marginalized communities must receive the biggest benefits from the massive public investment.

We believe in this project extending the Blue Line light rail from Minneapolis to Brooklyn Park because Black, Indigenous and People of Color (BIPOC) communities have a right to quality transit projects and safety improvements.

But we also know that, even with the best of stated intentions, light rail projects in the Twin Cities and nationwide have pushed the most vulnerable people out of their homes and businesses — over and over and over again. We must stop that cycle of displacement with a different planning approach — one that doesn’t aspire to equitable outcomes but takes the intentional steps at the appropriate time to achieve a different result.

In April, Hennepin County and the Metropolitan Council released their proposed Route Modification Plan, the latest step in a year’s long process and the last step before the project is essentially approved. But once again there are only loose commitments to address community concerns — no solid timeline for the passage of essential protections and community investments before the onslaught of development and displacement pressures begin.

We have seen this before. Years before the train was supposed to break ground, the previously proposed route through Harrison Neighborhood brought development that was unaffordable to local residents and pushed people out. It is incumbent on the project leaders to identify a “community-supported route.”

We say unequivocally that our community does NOT support this route and rejects any further project planning until:

  • Clearly communicated concerns around gentrification are addressed first — not left to 2023 or beyond following the conclusion of a county work group
  • Strong anti-displacement policies are in place — not simply proposed for future adoption without any assurance that those protections will materialize
  • A plan with funding and specific strategies outlined by Harrison Neighborhood Association is in place to repair the harm to the Harrison community — not simply discussed as an unfortunate consequence of previous route planning
  • Significant financial resources are secured to ensure increased ownership and stability for marginalized businesses and residents — not an unmet aspiration left to the political will of future leaders

This is the moment that we can choose to make bold decisions that make this project an example of justice and equity for cities across the nation. We will continue to withhold our support until we, as a community, can be assured that this project will not displace us.

BLC Releases Community Report

Since 2013, the Blue Line Coalition has been working together to ensure government leaders recognize that the Blue Line extension is a racial justice and regional equity issue and that community inclusion and leadership must be central to ALL planning and outcomes.

In coming months, key decisions will be made about the route of the light rail — and the outcomes will impact our neighborhoods and families for generations to come.

It is imperative that community concerns are not just affirmed but acted upon before route selection and construction begin.

BLC Responds to Draft Route Modification Report

January 25, 2022

Dear Governor Walz, Representative Omar, Commissioner Fernando, Commissioner Lunde, Chair Zelle, Mayor Frey, Council member Ellison, 

The Blue Line Coalition is rooted in the BIPOC and immigrant communities that will be most impacted by the Blue Line Extension project. Since 2013, we have been working together to make sure government leaders recognize the Blue Line extension is a racial justice and regional equity issue and that community inclusion and leadership must be central to ALL planning and outcomes.

After nearly a decade of planning, and more than $100 million spent, the Met Council and Hennepin County announced in August 2020 that they were abandoning the previous route for the Blue Line Light Rail Extension project. Since March of 2021, the project team has been engaging community members along the new proposed routes with the goal of identifying a “community supported route” by April 2022.

We believe in this project because our communities have a right to quality transit projects and safety improvements. We see a vibrant future where fast, reliable transit options make it possible for a mother to attend her daughter’s soccer game instead of waiting on multiple bus transfers. We see train stops that serve and grow immigrant and BIPOC business districts that create wealth and stability in our cultural communities. We see safe street crossings that allow elders to walk to their community-owned grocery store. 

But that requires a different planning approach — one that doesn’t aspire to equitable outcomes but takes the intentional steps at the appropriate time to achieve a different result. 

Because of our decades of deep relational organizing and years of engagement on this project, the Blue Line Coalition has the expertise and solutions to advance equitable outcomes. Together, BLC partners have successfully advocated for community-centered approaches, including advocating for adequate funding to resource community organizations in building trusting relationships with people who have vital expertise but have been blocked from participation due to cultural, language, financial or other barriers; extending the timeline for the selection of a new route to create space for authentic community engagement; and centering the adoption of anti-displacement policies as an essential aspect of the planning process. 

The “Draft Route Modification Report” only further underscores that displacement and gentrification are a broadly held and overwhelming concern of the communities most likely to be negatively impacted by development pressures and construction impacts from the project. While the report consistently elevates this concern our communities need more than recognition — they need action. We applaud the creation of the Anti-Displacement Work Group, but we must match the timelines of route selection and policy implementation to avoid yet another cycle of too-little too-late when it comes to protecting the interests and demands of our communities.  

The “Draft Route Modification Report” also highlights how some touted aspects of community engagement continue to leave us out. For instance, 51% of respondents to the online survey were white, while just 6% were Black and 3% Latinx — and the majority earned more than $60,000 per year. In addition, the community engagement cohort lacked representation from Spanish-speaking organizations and important aspects of engagement, like the online map, were created only in English, leaving out large segments of the community who speak other languages. This project should and must include the input of all stakeholders, but these disparities in certain types of engagement must be acknowledged, transparently, in weighing community input. 

And, more broadly, the community engagement process led by the project team continues to give only surface-level content to community members — for instance, visualizations of the proposed routes and stations — without  any concrete information about the pre construction, during construction or post construction impacts that are essential to informed decision making. And the impact of the pandemic and uprising cannot be overstated in its impact on community-based outreach efforts, given the serious health concerns and ongoing trauma in our communities.

There is an urgent need to redress the disinvestment and lack of transit options our neighborhoods have endured for generations. The project will only have an authentic “community-supported route” when the project team: 

  • Continues to invest resources to learn from community members who are Black, Immigrant, Indigenous, People of Color, and who are underrepresented in the current engagement efforts but disproportionately impacted by development pressures; this includes involuntary displacement as a result of the construction of the Blue Line Extension Project. The representation on the engagement efforts should represent the demographic of the corridor.
  • Before deciding on  a “Community Selected Route”, allows CURA’s Anti Displacement Workgroup initiative to conduct their proposed work plan. This plan would develop deep awareness and buy-in from decision makers who will be in charge of implementing and enforcing policy solutions that create protections for tenants, production of affordable housing, and preservation of older stock of housing which is currently more affordable than market rate.
  • Brings investment to the corridor and allows for the community to learn about those opportunities that can impact employment opportunities across the corridor, affordable housing, free fares for families and individuals who live on the blue line, business incubators, and other strategies that can help start the healing process in the area after decades of lack of investment and racist policies that have kept our communities from building wealth, power and influence. 

This project can and MUST be different than those before it. There is no doubt that many light rail lines in our region — and across the country — have pushed out current residents, immigrants and communities of color from their homes and businesses. This is the moment that we can choose to make bold decisions that make this project an example of justice and equity for cities across the nation. Our communities have the solutions and we urge you to not just hear and study our concerns but work with us to create lasting change.

Our Lives Are on the Line- Community Update

From going to work to getting groceries, from doctor’s appointments to religious worship, our ability to move through our communities determines our quality of life and access to opportunities. Safe, affordable and efficient transportation choices are essential to our freedom, dignity and economic wellbeing. But, for generations, government agencies have created planning processes that do NOT center the voices of our immigrant, refugee, low-wealth and BIPOC communities.

As the Blue Line Extension project moves forward, we need government and institutional leaders to fully recognize that “Our Lives Are On the Line” — our homes and businesses, our places of worship and gathering spaces are the fabric of the communities along the Bottineau Corridor. With the exploration around a new route and development of anti-displacement policies, it is more important than ever that community-based organizations with deep trust and ties to the most directly impacted residents have a strong voice in this process. 

Since 2013, the Blue Line Coalition has been working together to make sure government leaders recognize the Blue Line extension is a racial justice and regional equity issue and that community inclusion and leadership must be central to ALL planning and outcomes. On July 13 we hosted a community update and conversation with BLC leaders to learn about our work, the progress of project and the implications for our communities! 

Download the one-pager for the event here — and watch the recording here!

Recap + Videos: Actualizing Equity in Transportation

From the freeway through Rondo to the absence of reliable transit in the northwest suburbs, generations of transportation investments have bulldozed or bypassed communities of color. But coalition organizing has put equity at the forefront of major transportation projects in the Twin Cities.

At the Alliance’s March 2021 event, Keith Baker (Reconnect Rondo), Denise Butler (African Career, Education and Resource Inc), Melvin Giles (Urban Farm & Growers Alliance) and Qannani Omar (Harrison Neighborhood Association) discussed approaches and strategies for equitable and restorative transportation projects.

Watch the full video recording

Watch clips from the speakers

Download the written recap

BLC Statement on Revised Routes Announcement: Make Equity and Inclusion Real

On March 11, the Metropolitan Council and Hennepin County introduced new Blue Line Extension LRT route options. The Blue Line Coalition — a coalition of community-based organizations representing marginalized populations along the proposed corridor — released the following statement in response to this announcement. 

Less than a year ago, in the wake of George Floyd’s murder, government institutions — from the Governor to Met Council to city leaders — made clear, public commitments to equity, justice and inclusion. But today, as our communities are re-traumatized by the Derek Chauvin trial and increased police presence across the Twin Cities, we learn yet again that the lives of our Black and Brown, Indigenous and Immigrant communities are left out of the critical conversations that have had and will have a deep and lasting impact on our lives.

Institutions at this table have not followed through on the promise to include the Blue Line Coalition as an authentic partner with a meaningful seat at the table. We are forced to react to discussions that have not included us or our communities — discussions that have resulted in a major step in this process. While we have attended hundreds of hours in meetings, we were given just five hours advance notice of the new proposed routes. This continues the generational history of transportation planning as an insidious tool of systemic racism. We can do better.

Since 2013, the Blue Line Coalition has partnered in good faith with Hennepin County and other groups to engage residents and stakeholders to ensure the Blue Line Extension project benefits rather than displace immigrant and BIPOC communities along the route. Our primary ask has been clear and consistent: For this project to be equitable, the voices of directly impacted communities must be centered. But, at every point along the process, we have been minimized or excluded.

Most notably, we are deeply discouraged by the absence of Olson Memorial Highway among the route options. For years, Harrison Neighborhood Association and its residents have dedicated countless hours to providing input and articulating a vision for a transit line that will ultimately bypass their community. It is now clear that residents were asked to design their own displacement. While project leaders assured us that the coming light rail would bring street safety improvements and affordable housing resources, it has only resulted in zoning changes for new development and skyrocketing rents and property values. We urged leaders that anti-displacement policies couldn’t wait until construction — and we were right. Now, many of the residents who participated in the initial community engagement have been denied the opportunity to benefit from any transit improvements in North Minneapolis because they have been pushed out.

As a coalition, we stand in solidarity with Harrison Neighborhood Association and its residents, while also maintaining a sense of urgency to move forward and bring needed transportation options to our communities. In addition to addressing the harms to Harrison and other Near North neighborhoods, we strongly urge Hennepin County and Met Council to:

  • Provide transparency and accountability around the funds allocated to facilitate negotiations with BNSF.
  • Revise Hennepin County’s contracting process and increase the funding for community-based organizations to do the essential engagement to reach directly impacted residents and actualize equity in the process and outcomes of this project. The resources allocated for community engagement are dramatically less than the real cost and scope of organizing and the complexity and length of the contracting process is a significant barrier.
  • Actively engage with us in advancing policies for equitable housing and affordable commercial spaces to ensure our communities are able to stay in their homes, thrive in their businesses and save hundreds of hours wasted by a poorly designed transit system to spend with their families and loved ones.
  • Prioritize anti-displacement policies at the forefront in all levels of decision-making regarding this project. While government entities have had years to plan and implement a light rail extension that properly addresses the impacts of development and provide strong anti-displacement policies that center current residents in the community, largely BIPOC residents, there has been little to no progress.
  • Commit to true inclusion that shares information with our coalition as early as possible in any decision-making or public announcements to allow our organizational members and the constituencies we represent the opportunity to review, process and respond in a timeframe that respects our expertise and honors the many competing issues in our communities. The recent announcement of the possible new routes is a present example of the continuous pattern of interactions in which there is a lack of intentionality to obtain equitable outcomes and our coalition is made to react rather than participate.
  • Act on our shared understanding of the tremendous potential impacts — both positive and negative — of the development of this line, specifically learning from previous lessons, including the experiences of the Harrison and Near-North neighborhoods. The immense equity implications of this project necessitate intentionality and accountability in all aspects of the process. We will not ask our communities to design their own displacement.

For generations, highway projects have decimated Black business districts to spare white neighborhoods. Transit projects have skipped over communities of color to whisk white commuters to downtown job centers. The decisions about the Blue Line extension will further entrench this pattern by promoting displacement or we can reimagine the public process to support success and vitality of our immigrant and BIPOC communities.

As we said in August, we are disappointed, but we are not disheartened. We know our voices have shifted the narrative and our efforts have set a clear course for equitable engagement. We want to walk together with all of you in this journey to bring light rail to the North Minneapolis and the northwest suburbs but we need your trust and cooperation to shift the long legacy of transportation planning as a driver of destruction and displacement in our communities.

By intentionally working with us to address what has been holding us back we can unleash the economic potential of people who live financially burdened, one unexpected expense away from eviction. Together, we can give back hundreds of hours spent on poorly designed transit to families or individuals who can choose to invest that time in themselves, their families and their communities. With our communities at the center, we can — and must — transform transportation planning into a tool for inclusion and equity. The time to act is now.

BLC to Governor, Met Council and Hennepin County: Ensure Blue Line Extension LRT benefits our communities

On August 12, the Blue Line Coalition sent the following set of recommendations regarding the alignment and construction of the Blue Line extension project to key policy leaders. Read the letter below or download the PDF. Read the BLC’s public statement here.

Dear Governor Walz, Metropolitan Council Chair Zelle, and Hennepin County Board,

The Blue Line Coalition is a coalition of organizations in relationship with immigrant and Black communities living in North Minneapolis and the Northwest suburbs in the Bottineau corridor. We stand together to call upon our elected officials to ensure the METRO Blue Line Extension LRT gets built in ways which create the equitable development, economic opportunities and access this line has the capacity to bring. It is vitally important to the health of our communities and, consequently, to the health of our entire region that:

  • The METRO Blue Line Extension gets built to connect Northwest suburbs to downtown Minneapolis in the most timely fashion, but without inferior quality due to haste.
  • The mode of this line remains light rail transit.
  • This project does not lose its place in line for federal New Starts dollars.
  • All options are kept on the table to move forward with the current alignment, while alternative alignments are evaluated.

As you know, for generations, transportation has been misused as a tool for systemic racism, letting highway projects decimate Black business districts to spare white neighborhoods. Previous transit projects prioritized white commuters while skipping over communities of color on their way to downtown job centers.

However, starting in 2013, the Blue Line Coalition partnered with Hennepin County to engage communities along the current alignment, whose lives are integrally tied to that alignment in their housing, jobs and livelihoods. We had a shared goal, to ensure this METRO Blue Line Extension is planned and implemented in an inclusive and equitable way, and we rose to the challenge of this shared goal. The BLC put forward visions of equitable development along the corridor in our Equitable Development Principles & ScorecardHousing Policy Platform, and Station Area Plans.

Last week, like so many others, we were surprised and frustrated by the announcement to abandon negotiations with BNSF Railway on the route. Along with elected leaders, in the corridor cities, we have a very strong preference for this project to proceed as light rail. If a new route is necessary, the start and end points must remain the same to connect our communities and keep our place in line for federal funding. But, more than an allegiance to any one alignment, we are dedicated to advancing critical transit options that are the backbone of racial and regional equity.

Despite our disappointment, our coalition sees the additional possible opportunities in this announcement for a second beginning in which we can be creative and use the lessons, tools and information we’ve acquired over the seven years working together with Hennepin County to make this light rail transit project a reality.

We look forward to building upon this innovation by executing a plan that is intentional about benefiting all communities of color and implementing tools that address oppressive systemic issues. The opportunity exists to explore additional options, to lead with inclusivity, and to work together towards an extension line project that best meets the needs and dreams of our communities.

Thank you for your commitment to One Minnesota and the continued fight against systemic issues that keep our communities of color excluded from developing wealth, and segregated from opportunities in our region.